|
|
|
Concrete Pad
On Sunday, November 5th, 2006 they erected the re-bar for each of the columns and poured a 30 cm thick concrete footing for each.
|
|
|
On Sunday, November 5th, 2006 they erected the re-bar for each of the columns and poured a 30 cm thick concrete footing for each.