|
|
|
Porch Steps
On April 8th they started finishing the front porch and steps. They also grouted the floor tile and installed bathroom fixtures and the outdoor electrical outlets.
|
|
|
On April 8th they started finishing the front porch and steps. They also grouted the floor tile and installed bathroom fixtures and the outdoor electrical outlets.